$179
High Pressure Grouting Injection Pump Leak Stoppage 230539
Description
Item number: 230539
High Pressure Grouting Injection Pump Leak Stoppage Machine Pour Machine Construction Crack Filling Machine 230539
-
Specification:
High pressure pouring machine is the building and build a chemical grout sealing, structural reinforcement of specialized equipment
Working pressure: instantaneous maximum pressure up 15,000psi, flow rate of 0.74 liters/minute, chemical pulp can enter more than 0.02mm depth of 1000mm hairline cracks
Machinery components must locking screws, drill must be fully inserted into the holder, not loose, high-pressure and high-pressure pipe and the main body perfusion machine gun connections must be wrapped after the raw material belt tightened to prevent leakage of slurry
Notice:
1. Machine during transport will be shaking before use, to tighten all the screws again
2. Non impregnated with the slurry particles ingredients
3.Pressure does not prohibit the use of the viscosity of the liquid, pressure testing machine to test the use of oil and other
4.The color of parts varies slightly with different production batches
Machine cleaning method:
Wash the machine in time after use, so as not to cause machine blockage.
1. Before the construction, please prepare the thinner of the cleaning machine. After the construction, the machine should be cleaned, such as Tianna water, pine perfume, banana water, etc.
2, cleaning method: pour the thinner into about 500 ml into the barrel of the machine, put the gun head into the barrel, clean the boot cycle, wash for a while, squirt, pour in new thinner, In the same way, the machine must be cleaned, and the second time the diluent can be used as the first cleaning after the next construction. After the thinner is ejected, pour the oil into the oil. In the same way, it will be circulated for a while and sprayed into the oil drum. This will discharge the thinner and protect the sealing parts inside the machine.
3.During the next construction, pour the slurry into the bucket, start it first, and drain the oil remaining in the machine. When the slurry comes out, start grouting.
Always test the pressure with oil before the new machine is used for the first time.
1. The machine will shake during transportation. Please tighten all the screws before using the machine.
2. Test the pressure of the machine. It is forbidden to test the working pressure with liquid without viscosity (such as toluene, acetone, water, etc.). Use oil such as oil to test the pressure of the machine. If it is empty, the pressure gauge does not show pressure.
3. Test method: pour the lubricating oil into the barrel of the machine, close the valve, the gun head is facing the outside, open the electric drill, when the pressure gauge shows the pressure of 300-400 kg, turn off the electric drill, open the valve, it will lubricate The oil is sprayed back into the oil drum, and the pressure test is successful.
Item included: 230539
1*110V High pressure injection pump
Notice
1.Limited stock, please purchase ASAP if you want it.
2.Before pickup, please call us to make sure.
3.The price will be adjusted when there's large fluctuations in exchange rates and raw material costs.
4.Advertising price does not include the tax.
Warehouse Address:
2220 Midland Ave., Unit 60AP (Administration Park)
Scarborough, ON M1P3E6
Business Hours:
Monday - Friday 9:00am - 4:30pm
Saturday & Sunday Closed
* For PICK UP, appointment by phone needed.
Tel: 647-350-2889 416-727-3877
http://asc365.com/newproductdetail.asp?productid=230539&typeid=1868
High Pressure Grouting Injection Pump Leak Stoppage Machine Pour Machine Construction Crack Filling Machine 230539
-
Specification:
High pressure pouring machine is the building and build a chemical grout sealing, structural reinforcement of specialized equipment
Working pressure: instantaneous maximum pressure up 15,000psi, flow rate of 0.74 liters/minute, chemical pulp can enter more than 0.02mm depth of 1000mm hairline cracks
Machinery components must locking screws, drill must be fully inserted into the holder, not loose, high-pressure and high-pressure pipe and the main body perfusion machine gun connections must be wrapped after the raw material belt tightened to prevent leakage of slurry
Notice:
1. Machine during transport will be shaking before use, to tighten all the screws again
2. Non impregnated with the slurry particles ingredients
3.Pressure does not prohibit the use of the viscosity of the liquid, pressure testing machine to test the use of oil and other
4.The color of parts varies slightly with different production batches
Machine cleaning method:
Wash the machine in time after use, so as not to cause machine blockage.
1. Before the construction, please prepare the thinner of the cleaning machine. After the construction, the machine should be cleaned, such as Tianna water, pine perfume, banana water, etc.
2, cleaning method: pour the thinner into about 500 ml into the barrel of the machine, put the gun head into the barrel, clean the boot cycle, wash for a while, squirt, pour in new thinner, In the same way, the machine must be cleaned, and the second time the diluent can be used as the first cleaning after the next construction. After the thinner is ejected, pour the oil into the oil. In the same way, it will be circulated for a while and sprayed into the oil drum. This will discharge the thinner and protect the sealing parts inside the machine.
3.During the next construction, pour the slurry into the bucket, start it first, and drain the oil remaining in the machine. When the slurry comes out, start grouting.
Always test the pressure with oil before the new machine is used for the first time.
1. The machine will shake during transportation. Please tighten all the screws before using the machine.
2. Test the pressure of the machine. It is forbidden to test the working pressure with liquid without viscosity (such as toluene, acetone, water, etc.). Use oil such as oil to test the pressure of the machine. If it is empty, the pressure gauge does not show pressure.
3. Test method: pour the lubricating oil into the barrel of the machine, close the valve, the gun head is facing the outside, open the electric drill, when the pressure gauge shows the pressure of 300-400 kg, turn off the electric drill, open the valve, it will lubricate The oil is sprayed back into the oil drum, and the pressure test is successful.
Item included: 230539
1*110V High pressure injection pump
Notice
1.Limited stock, please purchase ASAP if you want it.
2.Before pickup, please call us to make sure.
3.The price will be adjusted when there's large fluctuations in exchange rates and raw material costs.
4.Advertising price does not include the tax.
Warehouse Address:
2220 Midland Ave., Unit 60AP (Administration Park)
Scarborough, ON M1P3E6
Business Hours:
Monday - Friday 9:00am - 4:30pm
Saturday & Sunday Closed
* For PICK UP, appointment by phone needed.
Tel: 647-350-2889 416-727-3877
http://asc365.com/newproductdetail.asp?productid=230539&typeid=1868
When you call, please mention you found this ad on OKZ.ca